Subscribe

Stay informed

Get the day's top headlines delivered to your inbox every morning.

By subscribing, you agree to our Privacy Policy

The Daily Chronicle

Truth in Every Story

twitterfacebookinstagramyoutube

News

  • Politics
  • Business
  • Technology
  • World

Features

  • Opinion
  • Culture
  • Sports
  • Video

Company

  • About Us
  • Contact
  • Careers
  • Advertise

Legal

  • Privacy Policy
  • Terms of Service
  • Cookie Policy
  • Accessibility

© 2026 The Daily Chronicle. All rights reserved.

SitemapRSS Feed
News

Oborevwori took over failed federal road over daily hardship — Izeze

Delta State Commissioner for Works (Highways and Urban Roads), Comrade Reuben Izeze, said Governor Sheriff Oborevwori approved the takeover and reconstruction of the failed Effurun–Ohorhe section of the federal highway

Author 18229
April 20, 2026·2 min read
Oborevwori
Oborevwori
Share this article

Delta State Commissioner for Works (Highways and Urban Roads), Comrade Reuben Izeze, said Governor Sheriff Oborevwori approved the takeover and reconstruction of the failed Effurun–Ohorhe section of the federal highway due to the daily hardship experienced by Deltans and other Nigerians plying the route.

Izeze disclosed this on Monday during an inspection of the ongoing 10-kilometer dualization of the Effurun to Ohorhe Junction along the Effurun-Sapele Road.

He noted that the intervention underscored the administration’s empathy and commitment to the well-being of road users.

Advertisement

300x250

Izeze stated, “The Governor is deeply concerned about the hardship faced by motorists and road users on this corridor.

"That is why the state took over this section of the federal road. Even though it is a federal highway, Deltans and Nigerians use it daily to earn a living, and they are the ones bearing the brunt of its poor condition.”

The Commissioner, who was accompanied by the Functioning Permanent Secretary, Engr. Solomon Aghagba and other top officials of the Ministry of Works expressed satisfaction with the quality of work executed so far, stating that it conforms with prescribed standards.

“The quality of the work we have seen is according to specification. We are currently standing on a 7.3-meter pavement being reinforced and awaiting concrete application. Everything we have observed aligns with approved standards,” he said.

He commended the contractor, China Civil Engineering Construction Corporation, for maintaining quality delivery and a commendable pace, but urged the firm to accelerate work to alleviate the hardship commuters face.

Advertisement

300x250

“Considering the heavy traffic on this road, we must commend CCECC for the progress made so far. However, we urge them to increase the pace so that at least one lane can be completed soon for traffic diversion, which will help reduce the suffering of road users,” Izeze added.

Appealing for patience, the Commissioner acknowledged the inconvenience caused by the ongoing construction and assured motorists that efforts are being intensified to deliver the project within a reasonable timeframe.

He explained that the road, when completed, would be over 11 meters wide, comprising a 7.3-meter carriageway, a 2.76-meter left shoulder, and a 1.5-meter right shoulder.

He noted that adopting rigid concrete pavement was a deliberate choice to ensure durability, given the volume of traffic on the route.

A representative of the construction firm, Engr. Ayunku Selekenwei also confirmed that the project is scheduled for completion in April 2027.

Tags:Oborevwori
Share this article
Author 18229

Advertisement

300x250

Related Articles

Nigerian DJ pushes girl-child empowerment with Guinness World Record bid

Nigerian DJ pushes girl-child empowerment with Guinness World Record bid

A Nigerian disc jockey (DJ) is set to attempt a Guinness World Record with a 72-hour non-stop livestream, it emerged on Friday. The event, tagged Mobi’s Mixathon, is structured as

3 minutes ago
Lagos upgrades 11 laboratories with global fund support

Lagos upgrades 11 laboratories with global fund support

Lagos State has intensified efforts to strengthen its healthcare system with a renewed drive to improve the quality of medical laboratory services across the state, in line with Governor Babajide

3 minutes ago
Why Lagos didn't prosecute Owode Onirin killings suspects, by Pedro

Why Lagos didn't prosecute Owode Onirin killings suspects, by Pedro

‎The Lagos State Government has dismissed allegations that it is shielding suspects linked to the killing of six traders at Owode Onirin. ‎It insisted that the decision not to prosecute

29 minutes ago
Alleged Coup: DHQ inaugurates general Court Martial to prosecute 36 military personnel 

Alleged Coup: DHQ inaugurates general Court Martial to prosecute 36 military personnel 

… bars media coverage  The Defence Headquarters (DHQ) on Friday commenced the trial of 36 military officers accused of plotting to overthrow the administration of President Bola Ahmed Tinubu. The

31 minutes ago

Advertisement

300x250